You cannot place a new order from your country. United States

Machine embroidered  palls

  • Machine embroided pall in white, red or green. Approximate measurements 16 x 16 cm. Made in 100 % linen. They can be hand washed. If color is not

  • Machine embroided pall. Measurements 6.33 inches square. 16 x 16 cm. Made in 100 % linen. They can be hand washed.

  • Machine embroided pall. Embroidered in red, white or green. If color is not specified in the order, it will be sent randomly. Measurements 6.33 inches

  • Machine embroided pall. Embroidered in red an Green. Measurements 6.33 inches square. 16 x 16 cm. Made in 100 % linen. They can be hand washed.

  • Machine embroided pall. Embroidered in red, white or green. If color is not specified in the order, it will be sent randomly. Measurements 6.33 inches

  • Machine embroided pall. Embroidered in red or green. If color is not specified in the order, it will be sent randomly Measurements 6.33 inches square.

  • Machine embroided pall. Embroidered in red, white or green.If color is not specified in the order, it will be sent randomly. Measurements 6.33 inches

  • Machine embroidered pall with gold embroidery on polyester damask. The back is made of 100 % linen. Measurements 6.33 inches square. 16 x 16 cm

  • Machine embroidered pall with gold embroidery on polyester damask. St. Michael shield. The back is made of 100 % linen. Measurements 6.33 inches

  • Machine embroidered pall with gold embroidery on polyester damask. The back is made of 100 % linen. Measurements 6.33 inches square. 16 x 16 cm.

  • Machine embroidered pall with gold embroidery on polyester damask. The back is made of 100 % linen. Measurements 6.33 inches square.

  • Machine embroidered pall with gold embroidery on polyester damask. The back is made of 100 % linen. Measurements 6.33 inches square. 16 x16 cm

x

Summer HolidaysSorry for the incoveniences

Our point of sale of Serrano 80 street, will remain closed from August, 1nd to 30st (included)

Factory and central offices, closed from August, 1nd to September, 1rd (included)

Online orders performed as of July 30 (included) will not be processed until September 2.